Why there is no reliable single blasting price
Two sites with the same estimated rock volume can require different equipment, drilling effort, mobilisation and controls. A quotation should therefore reflect measurable project information and the conditions observed at the workfront.
Online figures that ignore access, rock profile, surrounding structures and project requirements can create a false comparison between contractors.
